Question number: 1

» Manufacturing and Industrial Engineering » Production and Control » Production Planning

Appeared in Year: 2003

MCQ▾

Question

As tool and work are not in contact in EDM process

Choices

Choice (4) Response

a.

No force between tool and work occurs

b.

No relative motion occurs between them

c.

No power is consumed during metal cutting

d.

No wear of tool occurs

Question number: 2

» Manufacturing and Industrial Engineering » Production and Control » Material Requirement Planning

Appeared in Year: 2006

MCQ▾

Question

In an MRP system, component demand is:

Choices

Choice (4) Response

a.

Calculated by the MRP system from the master production schedule

b.

Forecasted

c.

Established by the master production schedule

d.

Ignored

Question number: 3

» Manufacturing and Industrial Engineering » Production and Control » Production Planning

Appeared in Year: 2010

MCQ▾

Question

Vehicle manufacturing assembly line is an example of:

Choices

Choice (4) Response

a.

Manual layout

b.

Fixed layout

c.

Product layout

d.

Process layout

Question number: 4

» Manufacturing and Industrial Engineering » Production and Control » Production Planning

Appeared in Year: 1997

MCQ▾

Question

Selection electrolyte for ECM is as follows:

Choices

Choice (4) Response

a.

Non-passivating electrolyte for stock removal and passivating electrolyte for finish control

b.

Passivating electrolyte for stock removal and non-passivating electrolyte for finish control

c.

Selection of electrolyte is dependent on current density

d.

Electrolyte selection is based on tool- work electrodes

Question number: 5

» Manufacturing and Industrial Engineering » Production and Control » Production Planning

Appeared in Year: 1995

Short Answer Question▾

Write in Short

The layout with a higher material handling effort is a……. . layout. (product/process)

Question number: 6

» Manufacturing and Industrial Engineering » Production and Control » Forecasting Models

Appeared in Year: 2006

MCQ▾

Question

The demand and forecast for February are 12000 and 10275,

respectively. Using single exponential smoothening method

(smoothening coefficient = 0.25), forecast for the month of March is:

Choices

Choice (4) Response

a.

431

b.

9587

c.

10706

d.

11000