Manufacturing and Industrial Engineering [GATE (Graduate Aptitude Test in Engineering) Mechanical Engineering]: Questions 10 - 13 of 115

Access detailed explanations (illustrated with images and videos) to 314 questions. Access all new questions- tracking exam pattern and syllabus. View the complete topic-wise distribution of questions. Unlimited Access, Unlimited Time, on Unlimited Devices!

View Sample Explanation or View Features.

Rs. 250.00 -OR-

How to register? Already Subscribed?

Question 10

Manufacturing and Industrial Engineering
Design of Patterns

Appeared in Year: 2003

Question

MCQ▾

The symbol used for Transport in work study is

Choices

Choice (4)Response

a.

b.

O

c.

d.

T

Question 11

Manufacturing and Industrial Engineering
Production Planning

Appeared in Year: 1997

Question

MCQ▾

Selection electrolyte for ECM is as follows:

Choices

Choice (4)Response

a.

Non-passivating electrolyte for stock removal and passivating electrolyte for finish control

b.

Passivating electrolyte for stock removal and non-passivating electrolyte for finish control

c.

Selection of electrolyte is dependent on current density

d.

Electrolyte selection is based on tool- work electrodes

Question 12

Manufacturing and Industrial Engineering
Solidification and Cooling

Appeared in Year: 2014

Question

Match List-Ⅰ List-Ⅱ▾

Match the following:

List-Ⅰ (Group a)List-Ⅱ (Group B)
(A)

Blow holes

(i)

Differential cooling rate

(B)

Shrinkage

(ii)

Improper fusion of two streams of liquid metal

(C)

Cold Shut

(iii)

Volumetric contraction both in liquid and solid stage

(D)

Hot tears

(iv)

Low permeability of the sand mould

Choices

Choice (4)Response
  • (A)
  • (B)
  • (C)
  • (D)

a.

  • (iv)
  • (iii)
  • (ii)
  • (i)

b.

  • (iii)
  • (ii)
  • (iv)
  • (i)

c.

  • (iii)
  • (i)
  • (ii)
  • (iv)

d.

  • (i)
  • (iii)
  • (ii)
  • (iv)

Question 13

Manufacturing and Industrial Engineering
Safety Stock Inventory Control Systems

Appeared in Year: 1997

Question

MCQ▾

Setup costs do not include

Choices

Choice (4)Response

a.

Cost of processing the work piece

b.

Maintenance cost of the machines

c.

Labour cost of setting up machines

d.

Ordering cost of raw material